York Energy Center Project

A Project

Newmarket, Ontario, Canada

EPTCON Ltd. provided EPC services for the 230 kV switchyard and interconnect to Hydro One for this 400MW Peaking Plant located in Newmarket, Ontario.

Scope of Work

  • Complete electrical & civil engineering
  • Complete civil works (grading, excavating, foundations, backfill yard, fence)
  • Supply and installation of ground grid and cable trench systems
  • Supply and installation of structural steel, HV breakers, switches, buswork, lightning arresters, CVT’s & metering units
  • Supply of control building including fabrication, supply and installation of protection and control panels
  • Interface with Hydro One and plant to complete design and end to end testing
  • Complete testing and commissioning of the switchyard and interconnect to Hydro One

Project Gallery