Third Line Transformer Replacement

A Project

Sault Saint Marie, ON, Canada

EPTCON Ltd. provided EPC Services for the replacement of a 230 kV/115 kV 250 MVA Transformer.

Scope of Work

  • Removal of Existing Transformer
  • Off-loading and Delivery to site of the New Auto-Transformer
  • Dressing and Testing of the Auto-Transformer
  • Design and Installation of a New Transformer Protection Relay Panel
  • Modifications to the associated Breaker Failure Protection Systems
  • Design and Installation of the New Field Control Cabling and Related Termination Rack
  • Complete Construction and Commissioning Services