Cedar Point II Wind Power Project – 115kV Substation

A Project

Forest, ON, Canada

EPTCON Ltd. provided Civil & Electrical Construction Services for the Cedar Point II Wind Power Project, consisting of one 115kV Substation, 34.5kV Underground Collection System and 115kV Overhead Transmission Line

Scope of Work

  • Civil Works (grading, drainage, trenching, excavating, foundations, backfilling)
  • Rebar and Anchor Bolt Cages for T-Line Foundations
  • Supply and Installation of Structural Steel
  • Ground Grid System and Wind Turbine and MET Tower Grounding
  • Supply and Installation of P&C Building
  • Installation of Free-Issued HV Equipment, 35kV Cables and Fiber Cable
  • Supply and Installation of Splices and Terminations for all 35kV Cable and Fiber Cable
  • Supply and Installation of Steel and Wood Poles, Insulators and Associated Hardware
  • Setup, String, Sag, Dead End and Clamp Free-Issued ASCR and OPGW
  • Testing & Commissioning